Category: Landscape works
The construction of the swimming pool, located on the first floor of a private house, took onl
y 2 months and the design work was completed in 2 weeks. The size of the pool was limited to the parameters of the room, and the exterior finish harmoniously blended into the overall concept of the interior. The swimming pool is equipped with all the necessary equipment for water purification, as well as decorative podstetkoj.